Setting Up Your First India Engineering Office: A 6-Month Roadmap from Lease to First Engineer

Setting up a first India engineering office takes about six months from decision to first engineers. Months 1 to 2 cover entity, compliance, and banking. Months 2 to 4 cover location, the leadership hire, and policies. Months 4 to 6 cover the first engineering hires and onboarding. The leadership hire should come before the team, not after.

PM
Pratik Mokashi
COO, Talhive · 40+ India mandates for US and EU clients
Key takeawaysThe whole piece in five lines
01A first India engineering office takes about six months from decision to first engineers.
02Months 1 to 2 cover entity, compliance and banking for a captive setup.
03Months 2 to 4 cover city choice and the first local leader.
04Months 4 to 6 bring the first engineers, onboarded into real work quickly.
05The costliest mistake is hiring engineers before a local leader or anchor is in place.
Discuss a mandate →

A six-month sequence, not a sprint.

The ones that struggle hire engineers first, then scramble for the structure to hold them. This roadmap lays out the order that works, drawn from real builds, so your first India office is something the team wants to stay in.

The companies that build a strong India office on the first try treat it as a sequence, not a sprint.

If you have ten minutes before a hiring review, read only this.

You are choosing a city
Compare Bangalore, Pune and Hyderabad
Depth, cost and attrition differ.
Engineers are ready to hire before a lead
Hire the leader first
The team needs a senior anchor.
The entity is not yet registered
Start in months one and two
Or begin on an EOR in parallel.

The 6-month timeline at a glance.

FROM DECISION TO FIRST ENGINEERS
PHASEMONTHSKEY MILESTONES
Foundation1 to 2Entity registration, statutory compliance, banking, payroll setup
Structure2 to 4City and workspace, first leadership hire, policies and benefits
Team4 to 6First engineering hires, onboarding, delivery setup

Months 1 to 2: entity, compliance, banking.

If you are building a captive, this is where it starts. Register the entity, set up statutory compliance and tax registrations, open banking, and stand up payroll. This phase is unglamorous and easy to underestimate; delays here push everything else back. If you want engineers working sooner, an EOR can bridge the first hires while the entity is finalized.

Planning a hire like this? Tell us the role and we will map the right approach within a week.

Book a consultation →

Months 2 to 4: location and first leader.

Choose the city deliberately. Bangalore offers depth but high cost and attrition; Pune and Hyderabad increasingly offer strong talent at lower cost and churn. Secure workspace sized for the 6 to 12 month plan, not day one.

Most importantly, make the leadership or anchor hire now, before the engineers. A senior local leader sets the hiring bar, the culture, and the retention that the whole office depends on.

Months 4 to 6: the first engineers.

With a leader in place, hire the first engineers against a clear bar. Onboard them into real work quickly, with a delivery process and overlap hours agreed with the home team. The first cohort sets the standard every later hire is measured against, so weight quality over speed.

The sequencing mistake to avoid.

The most common and most expensive error is hiring engineers before a local leader or anchor. Without someone senior on the ground, the bar drifts, onboarding is thin, and your best early hires leave within a year. Sequence the leader first; the team follows. The India GCC hiring playbook covers the hiring bar in more detail.

A first office is far easier with a partner who has run the sequence before. We built and staffed the NBA India team on this exact timeline, from foundation to a delivering engineering team. The India team build practice exists to compress those six months without cutting the corners that cause attrition later.

Where a specialist partner changes the outcome.

The decisions that make or break an India team are made in the first ninety days. A partner who has built teams before prevents each mistake from being discovered the expensive way.

Real mandates, real numbers.

CASE STUDYNBA, India technology teamINDIA TEAM BUILD

A first technology team in Mumbai with no prior operating footprint and sourcing restrictions that ruled out several obvious talent pools.

OFFER ACCEPTANCE
100%
ATTRITION AT 12 MONTHS
Zero
FIRST TWO ROLES
8 weeks

Planning your India team?

If you are hiring your first India employees, choosing a city or moving from an EOR to your own entity, we can map the right sequence for your stage before any commercial conversation.

A senior team member responds within one business day. No pitch deck, no obligation.

Discuss your hiring plan →

Frequently asked questions.

About six months from decision to first engineers if you are building a captive entity. An EOR can get a small team working in weeks while the entity is finalized, which many companies use as a bridge.
You can start with an EOR and add an entity later. The common path is to prove the market on an EOR, then transition into a GCC once headcount justifies the fixed cost.
Bangalore offers the deepest talent pool but the highest cost and attrition. Pune and Hyderabad increasingly offer strong engineering talent at lower cost and churn, which is why more companies are starting there in 2026.
Costs vary by city, workspace, and headcount. The larger ongoing cost is people, not setup, so budget around competitive compensation and retention rather than just entity and lease.
A senior local leader or anchor, before the engineers. This hire sets the bar, the culture, and the retention the whole office depends on. Hiring engineers first is the most common sequencing mistake.